No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | cv.Ramaditindo Perkasa - 75.629.406.2-306.000 | 88,33 | 88,33 | 66,98 | Rp. 295.570.000,00 |
Rp. 295.570.000,00 |
25,0 | 91,98 | |||||||||
2 | cv.selibarjayakonsultan - 74.525.439.1-309.000 | 5,0 | Tidak Mencapai Nilai Ambang Batas / Passing Grade | ||||||||||||||
3 | PT. RATU SOMMAN ENGINEERING - 80.590.064.4-307.000 | 28,37 | Tidak Mencapai Nilai Ambang Batas / Passing Grade | ||||||||||||||
4 | TITANIA CIPTA KONSULTAN - 02.613.020.3-301.000 | 24,9 | Tidak Mencapai Nilai Ambang Batas / Passing Grade | ||||||||||||||
5 | CV. TATA P'SETYA - 01.516.135.9-301.000 | 100,0 | 100,0 | ||||||||||||||
6 | SAUNARUNG MAHA CIPTA - 03.248.076.6-307.000 | 99,45 | 99,45 | ||||||||||||||
7 | CV. KOBA TEKNIK KONSULTAN - 02.671.128.3-307.000 | 46,61 | Tidak Mencapai Nilai Ambang Batas / Passing grade | ||||||||||||||
8 | CV. SAHARA CONSULTAN - 02.418.176.0-301.000 | ||||||||||||||||
9 | CV. MEKANIKA REKAYASA - 74.954.856.6-301.000 | ||||||||||||||||
10 | CV. SEMBILAN BENUA - 02.443.219.7-404.000 | ||||||||||||||||
11 | CV. PUTRA ARFAN MANDIRI - 81.580.021.4-302.000 | ||||||||||||||||
12 | CV. DODO PROPERTY - 75.502.662.7-309.000 | ||||||||||||||||
13 | HAIKAL GROUP MANDIRI - 83.710.982.6-307.000 | ||||||||||||||||
14 | CV. DUA PUTRA - 72.258.541.1-302.000 | ||||||||||||||||
15 | PT. SARANA GEOSPASIAL TERPADU - 03.189.660.8-403.000 | ||||||||||||||||
16 | CV.RADITYATAMA ENGINEERING KONSULTAN - 02.652.976.8-331.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak