No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Dimensi Arch Konsultan - 03.103.845.8-301.000 | 100,0 | 94,67 | Rp. 489.610.000,00 |
Rp. 489.610.000,00 |
Rp. 475.000.000,00 | |||||||||
2 | CV FAJAR BAHARI - 01.951.700.2-211.000 | skor tidak memenuhi passing grade | |||||||||||||
3 | PT. Astadipati Duta Harindo - 03.310.350.8-311.000 | ||||||||||||||
4 | CV. INTI SARI TEKNIK PRATAMA - 01.887.430.5-331.000 | ||||||||||||||
5 | CV. Bes Consultant - 01.496.327.6-218.000 | ||||||||||||||
6 | CV. Bina Lestari Consultant - 02.179.963.0-216.000 | ||||||||||||||
7 | DUTA CONSULTANT ENGINEERING - 01.555.011.4-218.000 | ||||||||||||||
8 | PT. INDHIE JAYA TEKNIK - 01.754.144.2-211.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak